Multirod Burst Test Program Progress Report for April-June 1979
Authors:
- UsdoeUSUsdoe
- UsnrcUSUsnrc
- Oak Ridge Oak Ridge National Laboratory (Ornl)O(Oak Ridge Oak Ridge National Laboratory (Ornl)
Open Access
- 1 November 1979
- report
- Published by Office of Scientific and Technical Information (OSTI)
Abstract
Posttest examination and analysis of the B-3 test were essentially completed, and preliminary results are presented. These results confirm indications published earlier that deformation in the B-3 test was indeed greater than observed in the B-1 and B-2 tests. The greater deformation in B-3 is believed to be due to the lower heating rate used in the test (about 10/sup 0/C/sec, compared with about 30/sup 0/C/sec for the B-1 and B-2 tests). Shakedown and demonstration tests of the new shroud and fuel-pin simulator temperature control systems were performed in the single-rod test facility with very encouraging performance. Some typical results are presented which indicate that the average temperature of the shroud can be controlled to within about 25/sup 0/C of the average simulator temperature during both ramp and flat-topped transient heating tests of interest. Conceptual design and tentative test conditions for the B-5 (8 x 8) bundle test were established, and detailed design of the test assembly was nearly completed. Fabrication of the fuel-pin simulators for the test array was initiated. The test is currently scheduled for May 1980.Keywords
Funding Information
- USDOE (W-7405-ENG-26)
- USNRC (DOE-40-551-75, NRC-FIN-B0120, DOE-40-552-75)