A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem
Authors:
- Achmad Pratama RifaiARAchmad Pratama Rifai
- Setyo Tri Windras MaraSMSetyo Tri Windras Mara
- Rachmadi NorcahyoRNRachmadi Norcahyo
- 1 January 2022
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 163
Abstract
No abstract availableKeywords
This publication has 46 references indexed in Scilit:
- Makespan minimization in online scheduling with machine eligibilityAnnals of Operations Research, 2013
- An adaptive large neighborhood search heuristic for the Pollution-Routing ProblemEuropean Journal of Operational Research, 2012
- A hybrid adaptive large neighborhood search heuristic for lot-sizing with setup timesEuropean Journal of Operational Research, 2012
- Meta-heuristics in cellular manufacturing: A state-of-the-art reviewInternational Journal of Industrial Engineering Computations, 2011
- A simulated annealing heuristic for the capacitated location routing problemComputers & Industrial Engineering, 2010
- Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problemNetworks, 2010
- An exact solution to the TLP problem in an NC machineRobotics and Computer-Integrated Manufacturing, 2007
- A hybrid setup for a hybrid scenario: combining heuristics for the home health care problemComputers & Operations Research, 2006
- Modelling a tool switching problem on a single NC-machineJournal of Intelligent Manufacturing, 1995
- Optimization by Simulated AnnealingScience, 1983