Abstract
Research shows that the artificial fractures formed by horizontal wells fracturing with multiple clusters exhibit poor uniformity, and only 1/3 to 1/2 of the shot hole clusters can be effectively reformed. This indicates that there is still considerable room for improvement in the reforming effect of hydraulic fracturing construction with multiple clusters. Improving the fracturing construction effect requires real-time monitoring of the fracturing construction process and real-time adjustment of the construction process by combining quantitative working condition data. To achieve real-time intuitive and quantitative tracking of segmented multi-cluster hydraulic fracturing construction, this paper adopts numerical simulation and digital signal processing methods to significantly improve the retrofitting effect of segmented multi-cluster hydraulic fracturing construction with the objectives of real-time monitoring of the fluid intake of a single cluster of shot holes and real-time monitoring of the working status of bridge plugs in segmented multi-cluster hydraulic fracturing construction. The results show that under the premise of wave point extraction by the continuous wavelet transform (CWT) method, it is feasible to achieve real-time monitoring of single-cluster grouting flow rate and bridge-plug working condition by the time-difference method, and the accuracy of single-cluster fluid flow rate monitoring can reach more than 95%, and the accuracy of bridge-plug position monitoring can reach more than 96%. Meanwhile, under the condition of a limited dataset, the Random Forest algorithm is used to identify the bridge plug leakage, and the R2 of the training model is greater than 0.9, and the absolute average error is 0.0105 m3/min.