This paper proposes a method for generation expansion planning that incorporates full-year hourly multiple load levels balance constraints, providing sufficient flexibility to address load fluctuations and intermittency associated with variable renewable energy sources. Typically, ensuring that the generation system possesses enough flexibility to manage this intermittency involves considering the operational characteristics of generators within unit commitment constraints. However, to mitigate the substantial computational burden caused by the number and type of variables, various approximation techniques are often employed. Unfortunately, these techniques can introduce unrealistic elements into the problem. Instead of considering the operational characteristics of generators, this approach classifies the system’s demand into three levels: base load, intermediate load, and peak load, using the proposed load classification method. The multiple load-level balance constraints are then applied to ensure that the capacity of generation units in each level is sufficient to meet their corresponding demand, with particular emphasis on matching fast-response generation units and their corresponding demand. The resulting generation expansion plan can be obtained with significantly reduced computational effort. The proposed load classification method and generation expansion planning approach have been tested using the latest power development plan of Thailand. Compared to another method that is not taken flexibility into account, 5 Gigawatts of fast-response generation capacity are selected instead of base load generation units. With the improved computational time achieved by the proposed generation expansion planning method, it can account for input data uncertainty by solving multiple generation expansion planning problems with varying input data and distinct individual probabilities.Keywords
Funding Information
- Energy Research Institute, Chulalongkorn University
This publication has 50 references indexed in Scilit:
- Unit commitment constraints in long-term planning models: Relevance, pitfalls and the role of assumptions on flexibilityApplied Energy, 2020
- A multi-objective framework for long-term generation expansion planning with variable renewablesApplied Energy, 2019
- Review of models for integrating renewable energy in the generation expansion planningApplied Energy, 2019
- State-of-the-art generation expansion planning: A reviewApplied Energy, 2018
- Generation expansion planning with high share of renewables of variable outputApplied Energy, 2017
- A multi-region load dispatch model for the long-term optimum planning of China’s electricity sectorApplied Energy, 2017
- Multi-year stochastic generation capacity expansion planning under environmental energy policyApplied Energy, 2016
- MILP model for long-term energy mix planning with consideration of power system reservesApplied Energy, 2016
- A multi-period, multi-regional generation expansion planning model incorporating unit commitment constraintsApplied Energy, 2015
- Reliability Evaluation of Power Systems1984