Structural behaviour of post-installed reinforcement bars in moment connections of wall-slabs
- 1 September 2019
- journal article
- research article
- Published by Elsevier in Engineering Structures
- Vol. 195, 536-550
Abstract
No abstract availableKeywords
Funding Information
- Research Grants Council, University Grants Committee
This publication has 8 references indexed in Scilit:
- Study on Seismic Damage Model of Post-installed Connection Between Steel and ConcreteInternational Journal of Civil Engineering, 2017
- Revisiting Unreinforced Strut Efficiency FactorACI Structural Journal, 2016
- Simulation of Tests on Cast-In and Postinstalled Column-to-Foundation Connections to Quantify the Effect of Cyclic LoadingJournal of Structural Engineering, 2016
- Design of post-installed reinforcing bars as end anchorage or as bonded anchorEngineering Structures, 2015
- Behavior of post-installed large-diameter anchors in concrete foundationsConstruction and Building Materials, 2015
- Behaviour of post-installed adhesive anchors in natural stoneConstruction and Building Materials, 2014
- New Design Methodology for Seismic Column-to-Foundation Anchorage ConnectionsACI Structural Journal, 2014
- Toward a Consistent Design of Structural ConcretePCI Journal, 1987