Scheduling dual gripper robotic cell: One-unit cycles
Authors:
- Inna G. DrobouchevitchIDInna G. Drobouchevitch
- Suresh P. SethiSSSuresh P. Sethi
- Chelliah SriskandarajahCSChelliah Sriskandarajah
- 1 June 2006
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 171 (2) , 598-631
Abstract
No abstract availableThis publication has 20 references indexed in Scilit:
- Cycles and permutations in robotic cellsMathematical and Computer Modelling, 2001
- Scheduling in dual gripper robotic cells for productivity gainsIEEE Transactions on Robotics and Automation, 2001
- Scheduling no-wait robotic cells with two and three machinesEuropean Journal of Operational Research, 2000
- Scheduling in robotic cells: Complexity and steady state analysisEuropean Journal of Operational Research, 1998
- Combinatorial optimization models for production scheduling in automated manufacturing systemsEuropean Journal of Operational Research, 1997
- An improved algorithm for cyclic flowshop scheduling in a robotic cellEuropean Journal of Operational Research, 1997
- Sequencing of robot activities and parts in two-machine robotic cellsInternational Journal of Production Research, 1996
- Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systemsIEEE Transactions on Robotics and Automation, 1996
- DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINEIIE Transactions, 1994
- Sequencing of parts and robot moves in a robotic cellInternational Journal of Flexible Manufacturing Systems, 1992