Enhancing Alarm Prioritization in the Alarm Management Lifecycle
Open Access
- 23 December 2021
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 99-111
Abstract
Despite significant improvements being made in control and safety systems, near-miss incidents and adverse accidents continue to occur in the industry. Indeed, humans have a vital role in process control success or failure due to their responses to abnormal situations and alarms. A broad study on the alarm system performance shows that good rationalization and accurate prioritization of alarms should increase the efficacy of alarm systems and improve operator decision performances. This paper discusses current gaps in alarm prioritization approaches. It then proposes a method based on Graph theory and metrics capabilities to facilitate and improve the alarm prioritization process. The method is developed based on the causal and layer of protection modeling, followed by measuring the graph metrics for prioritization purposes. Finally, the proposed method is evaluated through implementation in a simulated case study. Results show that this approach facilitates similar achievement to the alarm workshop and produces more valuable data to the cascade of abnormal situations in a structured method and shorter time.Keywords
This publication has 38 references indexed in Scilit:
- Line graph of combinations of generalized Bethe trees: Eigenvalues and energyLinear Algebra and its Applications, 2011
- Estimation of alarm chatteringJournal of Process Control, 2011
- Common procedural execution failure modes during abnormal situationsJournal of Loss Prevention in the Process Industries, 2011
- Hierarchical design of decentralized control structures for the Tennessee Eastman ProcessComputers & Chemical Engineering, 2008
- Centrality and network flowSocial Networks, 2005
- Human Performance Models for Response to Alarm Notifications in the Process Industries: An Industrial Case StudyProceedings of the Human Factors and Ergonomics Society Annual Meeting, 2004
- Decentralized control of the Tennessee Eastman Challenge ProcessJournal of Process Control, 1996
- Optimal steady-state operation of the Tennessee Eastman challenge processComputers & Chemical Engineering, 1995
- A plant-wide industrial process control problemComputers & Chemical Engineering, 1993
- A note on two problems in connexion with graphsNumerische Mathematik, 1959