Post-warranty maintenance strategy selection using shape packages process
Authors:
- Ahmed Noaman KararAKAhmed Noaman Karar
- Ashraf LabibALAshraf Labib
- Dylan JonesDJDylan Jones
- 30 October 2022
- journal article
- research article
- Published by Elsevier in International Journal of Production Economics
- Vol. 255
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- Failure modeling and optimizing preventive maintenance strategy during two-dimensional extended warranty contractsEngineering Failure Analysis, 2013
- Optimal post-warranty maintenance policy with repair time threshold for minimal repairReliability Engineering & System Safety, 2013
- Assessing maintenance contracts when preventive maintenance is outsourcedReliability Engineering & System Safety, 2012
- A decision model for adopting an extended warranty under different maintenance policiesInternational Journal of Production Economics, 2012
- Life cycle maintenance planning method in consideration of operation and maintenance integrationProduction Planning & Control, 2011
- Optimising age-replacement and extended non-renewing warranty policies in lifecycle costingInternational Journal of Production Economics, 2011
- A generic asset management framework for optimising maintenance investment decisionProduction Planning & Control, 2008
- A maintenance optimisation framework in application to optimise power station boiler pressure parts maintenanceJournal of Quality in Maintenance Engineering, 2007
- Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy processInternational Journal of Production Economics, 2007
- Optimal maintenance policies during the post-warranty periodReliability Engineering & System Safety, 2003