Scheduling Model for Rehabilitation of Distribution Networks Using MINLP
- 1 May 2013
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 139 (5) , 498-509
Abstract
Scheduling of the rehabilitation activities of water main networks depends mainly on available budget and planning time. Other factors such as network reliability, criticality, location, contract size, and rehabilitation method(s) affect the optimization of the scheduling process. This paper presents a method for optimized scheduling of rehabilitation work for water distribution networks. The method utilizes unsupervised neural networks (UNNs) and mixed-integer nonlinear programming (MINLP) and performs the scheduling in two stages. In the first stage, UNNs are used to cluster water mains into groups according to locations and rehabilitation methods of water mains. In the second stage, MINLP is used to determine the number of rehabilitation contract packages and the generation of optimized scheduling of these packages considering network reliability, criticality, contract size, and planning time. In order to demonstrate the essential features of the developed method, a case study was analyzed and the results obtained are discussed; highlighting their utilization in practice.Keywords
This publication has 10 references indexed in Scilit:
- The impact on environment of underground infrastructure utility workStructure and Infrastructure Engineering, 2011
- Selection Method for Rehabilitation of Water Distribution Networks2009
- Information-Guided Genetic Algorithm Approach to the Solution of MINLP ProblemsIndustrial & Engineering Chemistry Research, 2007
- Optimal Scheduling of Replacement and Rehabilitation of Water Distribution SystemsJournal of Infrastructure Systems, 2006
- Near-optimal rehabilitation scheduling of water distribution systems based on a multi-objective genetic algorithmCivil Engineering and Environmental Systems, 2006
- Condition Rating Model for Underground Infrastructure Sustainable Water MainsJournal of Performance of Constructed Facilities, 2006
- Iterative MILP methods for vehicle-control problemsIEEE Transactions on Robotics, 2005
- Optimal Scheduling of Water Pipe Replacement Using Genetic AlgorithmsJournal of Water Resources Planning and Management, 2001
- A Threshold Break Rate for Scheduling Optimal Pipeline Replacement2001
- Scheduling of Water Distribution System Rehabilitation Using Structured Messy Genetic AlgorithmsEvolutionary Computation, 1999