Post-Northridge connection with modified beam end configuration to enhance strength and ductility
Authors:
- Amir A. HedayatAHAmir A. Hedayat
- Murude CelikagMCMurude Celikag
- 1 July 2009
- journal article
- Published by Elsevier in Journal of Constructional Steel Research
- Vol. 65 (7) , 1413-1430
Abstract
No abstract availableThis publication has 15 references indexed in Scilit:
- Seismic rehabilitation of pre-Northridge steel moment connections: A case studyJournal of Constructional Steel Research, 2006
- A moment resisting connection for earthquake resistant structuresJournal of Constructional Steel Research, 2006
- Behaviour of steel moment connections with a single flange ribEngineering Structures, 2003
- Steel beams with large web openings of various shapes and sizes: an empirical design method using a generalised moment-shear interaction curveJournal of Constructional Steel Research, 2003
- Cyclic Response and Design Recommendations of Weak-Axis Reduced Beam Section Moment ConnectionsJournal of Structural Engineering, 2002
- Effect of Local Details on Ductility of Welded Moment ConnectionsJournal of Structural Engineering, 2001
- Parametric Tests on Unreinforced Steel Moment ConnectionsJournal of Structural Engineering, 2000
- Reinforcing of steel moment connections with cover plates: benefits and limitationsEngineering Structures, 1998
- Lessons from damage to steel buildings during the Northridge earthquakeEngineering Structures, 1998
- Lessons learned from the Northridge earthquakeEngineering Structures, 1998