Cost-Effective Temporary Microirrigation System for Grass Establishment on Environmentally Sensitive Steep Slopes
Authors:
- Yeboah Gyasi-AgyeiYeboah Gyasi-Agyei
- Yeboah Gyasi-Agyei, M.ASCE11Senior Lecturer, Centre for Railway Engineering, James Goldston Faculty of Engineering and Physical Systems, Central Queensland Univ., Rockhampton QLD4702, Australia.YAYeboah Gyasi-Agyei, M.ASCE11Senior Lecturer, Centre for Railway Engineering, James Goldston Faculty of Engineering and Physical Systems, Central Queensland Univ., Rockhampton QLD4702, Australia.
- M.AsceM.M.Asce
- 1 June 2004
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Irrigation and Drainage Engineering
- Vol. 130 (3) , 218-226
Abstract
An advanced technology cost-effective drip irrigation system design and setup on environmentally sensitive elevated steep slopes (batters) of a coal train derailment site in Central Queensland, Australia, are presented. The final profile of the coal burial site consists of six batters and associated berms with a drop in elevation of about 35 m. A small dam constructed downstream of the confluence of the two main drainage channels at the site supplied water for irrigation of the batters to aid the establishment of grass to control erosion. Water was periodically pumped from the small dam to three storage tanks using a petrol (gas) pump. Three solar pumps drew water from the storage tanks and dam to irrigate the top four batters. Contactors, pressure switches and irrigation control valves in turn shared a single solar power source between the solar pumps. Level balls (floating switches) placed in the storage tanks cut the solar power supply to the pumps when the storage tanks were nearly empty. On the whole, the irrigation system worked very well and excellent grass cover was established within 12 weeks. Given the environmental risks associated with the on-site burying of coal, and the estimated cost of about AU$11.73/m2 (every 10 years) in maintenance if the railway batters are not treated, the estimated total cost of AU$4.61/m2 of batter area treated with irrigation, including AU$3.08/m2 in irrigation cost, is justified.Keywords
This publication has 9 references indexed in Scilit:
- Optimum Use of Erosion Control Blankets and Waste Ballast (Rock) Mulch to Aid Grass Establishment on Steep SlopesJournal of Hydrologic Engineering, 2004
- Pond Water Source for Irrigation on Steep SlopesJournal of Irrigation and Drainage Engineering, 2003
- Equivalent Friction Factor Method for Hydraulic Calculation in Irrigation LateralsJournal of Irrigation and Drainage Engineering, 2002
- Quantitative evaluation of strategies for erosion control on a railway embankment batterHydrological Processes, 2001
- A simulation model for design and evaluation of micro‐irrigation systemsIrrigation and Drainage, 2001
- Continuous daily hydrograph simulation using duration curves of a precipitation indexHydrological Processes, 2000
- Using synthetic flow duration curves for rainfall-runoff model calibration at ungauged sitesHydrological Processes, 2000
- Analytical Approach for Direct Drip Lateral Hydraulic CalculationJournal of Irrigation and Drainage Engineering, 1998
- HYDRAULICS IN CIVIL AND ENVIRONMENTAL ENGINEERING1998