The ITER Vacuum Cryogenic Test Facility for Cryopumps and Other Clients
- 11 March 2026
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Plasma Science
- Vol. 54 (6) , 2873-2878
Abstract
ITER extensively uses cryo-pumping for its large vacuum volumes such as the cryostat (~8500 m3), the torus (~1330 m3), and the neutral beam injectors (~200 m3 each). Designed to meet ITER environment conditions, the eight identical cryopumps for torus and cryostat have been all delivered to ITER this year (NB cyropumps of different design are still under development). Each cryopump has a nominal design pumping speed of 100 m3/s for helium, with an 800 mm all metal isolation valve allowing speed modulation and regeneration during plasma operation. These pumps are the second largest client of the cryoplant after the magnets (25% of the overall heat load), and they are the results of a 20 years development. A test facility has been built in the cryoplant building to allow testing them for the first time in ITER relevant cryogenic conditions and gas loads. This is a key opportunity before final installation to characterize not only pump performances but also cryogenic supply operations. Currently equipped with inert gas injection system, the facility will be upgraded to allow testing with hydrogen and deuterium and to supply additional cryogenic clients such as fueling systems as in the ITER port cell. This article describes the test facility’s main features and the main results achieved from the first test campaigns.Keywords
Funding Information
- Instituto Tecnológico y de Energías Renovables
This publication has 5 references indexed in Scilit:
- Design, development and manufacture of the ITER Torus and cryostat cryopumpsFusion Engineering and Design, 2025
- Structural Integrity Assessment of ITER Torus Cryo-Pump HousingIEEE Transactions on Plasma Science, 2020
- Dynamic model of ITER Front-End Cryopumps Distribution System: Torus cryopumping and regeneration scenariosFusion Engineering and Design, 2017
- Preliminary design of ITER cryopumps front-end cryodistribution system instrumentation and controls2015
- The new build to print design of the ITER Torus CryopumpFusion Engineering and Design, 2013