Determining crane areas for balancing workload among interfering and noninterfering cranes
- 12 November 2012
- journal article
- research article
- Published by Wiley in Naval Research Logistics (NRL)
- Vol. 59 (8) , 656-662
Abstract
This article treats the problem of subdividing an area for storing containers such that the workload is evenly shared among the cranes operating the resulting subareas. We consider two crane sets: while noncrossing constraints between cranes of the same set need to be observed, cranes of different sets do not interfere. Such a problem setting is, for instance, relevant for scheduling the (un‐)loading of vessels by parallel quay cranes operating on opposing berths or in container yards with cross‐over cranes. We formalize the resulting optimization problem, prove computational complexity, and present exact and heuristic solution procedures. © 2012 Wiley Periodicals, Inc. Naval Research Logistics, 2012Keywords
All Related Versions
This publication has 9 references indexed in Scilit:
- Heuristics for quay crane scheduling at indented berthTransportation Research Part E: Logistics and Transportation Review, 2011
- Evaluating advanced quay cranes in container terminalsTransportation Research Part E: Logistics and Transportation Review, 2011
- Quay crane scheduling for an indented berthEngineering Optimization, 2011
- Determining fixed crane areas in rail–rail transshipment yardsTransportation Research Part E: Logistics and Transportation Review, 2010
- Determining crane areas in intermodal transshipment yards: The yard partition problemEuropean Journal of Operational Research, 2010
- A survey of berth allocation and quay crane scheduling problems in container terminalsEuropean Journal of Operational Research, 2010
- Performance analysis of berth configurations at container terminalsOR Spectrum, 2010
- Berth allocation at indented berths for mega-containershipsEuropean Journal of Operational Research, 2007
- Stowage and Transport Optimization in Ship Planning2001