Capacity-Oriented Train Scheduling of High-Speed Railway Considering the Operation and Maintenance of Rolling Stock
Open Access
- 11 May 2022
- journal article
- research article
- Published by MDPI AG in Mathematics
- Vol. 10 (10) , 1639
Abstract
The capacity of some busy rail lines is increasingly tight and passenger demand far exceeds the railway capacity. To schedule as many trains as possible in order to satisfy more transportation demands, we studied the capacity-oriented train scheduling problem. While most approaches focus only on increasing the capacity of the rail line, this research considers both the time-space distribution of transportation demands and the operation and maintenance of rolling stock. To solve this problem, we first constructed a time-space network to describe the time-space path of rolling stock. We then proposed an integer planning model with rolling stock maintenance and the OD service frequency constraints to maximize the number of running arcs in rail sections. After decomposing this model by introducing some Lagrangian multipliers to relax its hard constraints, we proposed a Lagrangian relaxation-based decomposition algorithm, including two path search sub-algorithms for rolling stock to optimize both the relaxed and the feasible solutions. Finally, we conducted a computation study on a practical double-track high-speed railway line to test the performance of this algorithm. It reports that the train timetables and the operation of rolling stock are well managed.Keywords
Funding Information
- National Natural Science Foundation of China (71871226, U1934216, P2021X008, 1053320211178)
- Systematic Major Research Project of China Railway (71871226, U1934216, P2021X008, 1053320211178)
- Self-exploration and innovation project for graduate students of Central South University (71871226, U1934216, P2021X008, 1053320211178)
This publication has 25 references indexed in Scilit:
- Scheduling heterogeneous train traffic on double tracks with efficient dispatching rulesTransportation Research Part B: Methodological, 2015
- Simultaneous train rerouting and rescheduling on an N-track network: A model reformulation with network-based cumulative flow variablesTransportation Research Part B: Methodological, 2014
- Flexible Connections in PESP Models for Cyclic Passenger Railway TimetablingTransportation Science, 2014
- Short-term Rail Rolling Stock Rostering and Maintenance SchedulingTransportation Research Procedia, 2014
- Improving the modulo simplex algorithm for large-scale periodic timetablingComputers & Operations Research, 2013
- Modeling Network Transition Constraints with HypergraphsTransportation Science, 2011
- Optimizing Timetable Synchronization for Rail Mass TransitTransportation Science, 2008
- A column generation approach to train timetabling on a corridor4OR, 2007
- Modeling and Solving the Train Timetabling ProblemOperations Research, 2002
- A Benders Decomposition Approach for the Locomotive and Car Assignment ProblemTransportation Science, 2000