Two-stage production lines with a single repair crew

Authors:

Abstract
This paper describes the analytic modelling of two-stage production lines with storage of workpieces between stages. The effect of stage failure, and repair by a single repair crew, on production rate and intermediate storage level are shown.

This publication has 14 references indexed in Scilit: