Production planning for a multi-item, single-stage kanban system
Authors:
- 1 May 1994
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 32 (5) , 1173-1195
Abstract
The kanban production authorization system has been widely implemented as a control scheme for just-in-time manufacturing. This system is normally applied in systems with reliable processes, low setup times, static demand and excess capacity. The use of kanbans avoids the need for complex information and hierarchical control systems on the shop floor. Kanban control also has the advantage of reacting quickly to minor demand changes. In this paper we investigate the use of kanban control at workcentres which produce multiple items with dynamic, random demand. The dynamic aspects of demand may cause temporary capacity shortages. The kanban control system automatically reacts quickly to the random aspects of demand. Selection of the number of kanbans will accommodate the dynamic aspect. We assume an environment with low setup times and a desire for rapid adjustment in production rates to match demand. A mathematical model for the problem is defined and shown to reduce to a simpler problem. Using the simpler problem, we investigate necessary and sufficient conditions for feasibility of the problem and specific choices of kanban levels. These conditions are used to define upper and lower bounds on the optimal number of kanbans which, in turn, are employed for developing optimal and near-optimal, heuristic algorithms for selecting kanban levels for each item. An algorithm is also derived for finding feasible production schedules given a feasible set of kanbans. The algorithm provides a policy which is easily implemented on the shop floor for guiding production decisions when capacity is limited. The methodology is illustrated with an example and results of experimental testing of the algorithm and heuristic are presented.Keywords
This publication has 14 references indexed in Scilit:
- DETERMINING THE NUMBER OF KANBANS IN MULTI-ITEM JUST-IN-TIME SYSTEMSIIE Transactions, 1993
- A dynamic programming model for the kanban assignment problem in a multistage multiperiod production systemInternational Journal of Production Research, 1991
- Analysis of a Kanban Discipline for Cell Coordination in Production Lines. IManagement Science, 1990
- A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal KanbansInternational Journal of Production Research, 1990
- Kanban Controlled Pull Systems: An Analytic ApproachManagement Science, 1989
- Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of LeadtimeIIE Transactions, 1987
- Configuring a Kanban system using a discrete optimization of multiple stochastic responsesInternational Journal of Production Research, 1987
- A Mathematical Programming Approach to a Deterministic Kanban SystemManagement Science, 1987
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978