Model of Predicting Cost Overrun in Construction Projects
Open Access
- 23 November 2018
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 10 (12) , 4387
Abstract
During the construction phase, significant differences between the planned and actual costs of construction projects frequently occur. The paper describes the concept of a model of prediction of the increase in the costs of construction works in relation to those planned. The assumption of the model is to determine the probability of the cost increase for the elements of the object for which it is the largest. A fuzzy Mamdani inference method was proposed for the selection of the elements to be evaluated. In the cost prediction model, fuzzy relations and the compound max-min relations were used. The result of the model are the probabilities of cost overrun for works most exposed to changes in costs. The model can be helpful mainly for the contractor who wants to know not only the probability of the total cost overrun but also the possibility and amount of increase in the costs of individual packages of works or detailed construction works necessary to complete a construction project. Such an approach may help to properly plan expenses related to the implementation and schedule of works along with the cash flow for the project.Keywords
This publication has 20 references indexed in Scilit:
- Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phasesTransport Policy, 2012
- Cost estimation model for building projects using case-based reasoningCanadian Journal of Civil Engineering, 2011
- Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic AlgorithmsJournal of Computing in Civil Engineering, 2010
- Determining Attribute Weights in a CBR Model for Early Cost Prediction of Structural SystemsJournal of Construction Engineering and Management, 2006
- Predicting Construction Cost Using Multiple Regression TechniquesJournal of Construction Engineering and Management, 2006
- Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus RegressionJournal of Construction Engineering and Management, 2003
- Use of Fuzzy Logic for Predicting Design Cost Overruns on Building ProjectsJournal of Construction Engineering and Management, 2002
- Underestimating Costs in Public Works Projects:Error or Lie?Journal of the American Planning Association, 2002
- Neural Network Model for Parametric Cost Estimation of Highway ProjectsJournal of Construction Engineering and Management, 1998
- Inaccuracy of traffic forecasts and cost estimates on large transport projectsTransport Policy, 1997