A Numerical Investigation of Longitudinal Track–Bridge Interaction in Simply Supported Precast Concrete Girder Railway Bridges
Authors:
- 1 August 2024
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Practice Periodical on Structural Design and Construction
- Vol. 29 (3)
Abstract
No abstract availableKeywords
This publication has 43 references indexed in Scilit:
- Track structural damage index for high-speed railway girder bridges considering residual deformations due to earthquakeBulletin of Earthquake Engineering, 2022
- Running safety evaluation of a train moving over a high-speed railway viaduct under different track conditionsEngineering Failure Analysis, 2021
- Study of bridge-subgrade longitudinal constraint range for high-speed railway simply-supported beam bridge with CRTSII ballastless track under earthquake excitationConstruction and Building Materials, 2020
- Long-term monitoring of the track–bridge interaction on an extremely skew steel arch bridgeJournal of Civil Structural Health Monitoring, 2020
- Numerical investigation into thermal load responses of railway transom bridgeEngineering Failure Analysis, 2016
- Integral model for train-track-bridge interaction on the Sesia viaduct: Dynamic simulation and critical assessmentComputers & Structures, 2012
- Safety assessment of a short span railway bridge for high-speed traffic using simulation techniquesEngineering Structures, 2012
- Beam-track interaction of high-speed railway bridge with ballast trackJournal of Central South University, 2012
- Longitudinal forces in continuously welded rails on bridgedecks due to nonlinear track–bridge interactionComputers & Structures, 2007
- Monitoring traffic loads and dynamic effects using an instrumented railway bridgeEngineering Structures, 2005