The Pedes Dam was planned to overcome the flood and drought disasters that often occurred in the Lamongan Regency, East Java Province. In 2012, the Ministry of Public Works carried out detailed designs to construct the Pedes Dam, including hydraulic structures such as a diversion tunnel. This study focuses on the Pedes Dam diversion tunnel, which covers rock mass quality, engineering geology, and excavation method recommendations. This study uses 2 (two) rock mass classifications, namely Rock Mass Rating (RMR) and Geological Strength Index (GSI), to determine the excavation methods for the Pedes Dam diversion tunnel. The results of the study indicate that the site of the diversion tunnel is in calcareous sandstone lithology with RMR value of 28 – 59 (poor – fair) and GSI value of 22 – 70.5 (poor – good); and floatstone lithology with RMR value of 29 – 52 (poor – fair) and GSI value of 30 – 56 (poor – good). The excavation method based on RMR is top heading and bench, with an excavation rate of 1 – 1.5 m at the top heading, and supports are installed simultaneously with excavation every 10 m from the excavation face. Based on GSI, the excavation methods for calcareous sandstone are digging, ripping, hammering, and blasting; while for floatstone, the excavation methods are digging and ripping. Furthermore, this study examines the relationship between RMR and GSI according to the lithology in the study area. The correlation equations between RMR and GSI are GSI = 1.3684RMR – 11.891 for calcareous sandstone and GSI = 0.9921RMR + 4.0545 for floatstone. The study’s findings should be helpful for building tunnels with comparable engineering geological conditions.

This publication has 10 references indexed in Scilit: