Preemptive scheduling in a two-stage supply chain to minimize the makespan
- 11 November 2014
- journal article
- research article
- Published by Taylor & Francis in Optimization Methods and Software
- Vol. 30 (4) , 727-747
Abstract
This paper deals with the problem of preemptive scheduling in a two-stage supply chain framework. The supply chain environment contains two stages: production and transportation. In the production stage jobs are processed on a manufacturer's bounded serial batching machine, preemptions are allowed, and set-up time is required before a new batch is processed. In the transportation stage each batch is delivered to a customer by a single vehicle. The objective is to minimize the makespan by making decisions for both mutually coordinated stages. Specifically, two versions are studied. The first one is that all jobs are available to be processed at time zero, and the second one is that jobs have different release times. An time algorithm is developed for the first version, and we show that it can produce the optimal schedule for the entire problem. For the second version, based on some useful properties we have designed an time heuristic and a novel lower bound. The worst-case performance ratio of our algorithm is bounded by 2. Our computational study with random instances of different scales shows high-quality solutions for either small-scale or large-scale instances returned in a reasonable PC times.Keywords
This publication has 25 references indexed in Scilit:
- Online heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion timeOptimization Methods and Software, 2013
- Tabu search and lower bounds for a combined production–transportation problemComputers & Operations Research, 2013
- Multi-objective analysis of an integrated supply chain scheduling problemInternational Journal of Production Research, 2012
- Genetic algorithms for coordinated scheduling of production and air transportationExpert Systems with Applications, 2010
- A genetic approach to two-phase optimization of dynamic supply chain schedulingComputers & Industrial Engineering, 2010
- Single machine scheduling and due date assignment with positionally dependent processing timesEuropean Journal of Operational Research, 2009
- Development of a multiobjective GA for advanced planning and scheduling problemThe International Journal of Advanced Manufacturing Technology, 2008
- The significance of reducing setup times/setup costsEuropean Journal of Operational Research, 2008
- On-line supply chain scheduling problems with preemptionEuropean Journal of Operational Research, 2007
- How useful are preemptive schedules?Operations Research Letters, 2003