Abstract
The article reconstructs the main stages and trends in the construction of hydroelectric engineering facilities on the Irtysh River throughout the Soviet period of national history. The analysis is carried out in connection with the Soviet economic strategies, specifically as they were applied to the Upper and Middle Irtysh regions. The study reflects how perceptions of the primary objectives and functions of the Irtysh Hydroelectric Cascade evolved in accordance with changes in Soviet economic policy during different periods of the 20th century. The paper demonstrates the continuity of approaches to the design and construction of hydroelectric power plants (HPPs) and provides a characterization and schematic representation of the three main hydroelectric complexes—Ust’-Kamenogorsk, Bukhtarma, and Shul’ba—as well as of the cascade as a whole.