Mathematical Formulation for Mobile Robot Scheduling Problem in a Manufacturing Cell
Open Access
- 1 January 2012
- book chapter
- Published by Springer Nature
- p. 37-44
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing timesEuropean Journal of Operational Research, 2011
- Parametric algorithms for 2-cyclic robot scheduling with interval processing timesJournal of Scheduling, 2010
- Feeding sequence selection in a manufacturing cell with four parallel machinesRobotics and Computer-Integrated Manufacturing, 2005
- The Vehicle Routing Problem2002
- Cyclic scheduling in robotic flowshopsAnnals of Operations Research, 2000
- A neural network approach for a robot task sequencing problemArtificial Intelligence in Engineering, 2000
- Cyclic scheduling in 3-machine robotic flow shopsJournal of Scheduling, 1999
- Cyclic Scheduling of Identical Parts in a Robotic CellOperations Research, 1997
- Optimizing robot's service movements: A one dimensional caseComputers & Industrial Engineering, 1987