An exact parallel method for a bi-objective permutation flowshop problem
Authors:
- J. LemesreJLJ. Lemesre
- C. DhaenensCDC. Dhaenens
- E.G. TalbiETE.G. Talbi
- 1 March 2007
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 177 (3) , 1641-1655
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- Theory and Methodology A bicriteria approach to the two-machine flow shop scheduling problemEuropean Journal of Operational Research, 1999
- Benchmarks for shop scheduling problemsEuropean Journal of Operational Research, 1998
- A bicriteria two-machine permutation flowshop problemEuropean Journal of Operational Research, 1998
- Minimizing total tardiness in permutation flowshopsEuropean Journal of Operational Research, 1995
- Heuristics for scheduling in flowshop with multiple objectivesEuropean Journal of Operational Research, 1995
- Multiple and bicriteria scheduling: A literature surveyEuropean Journal of Operational Research, 1995
- A genetic algorithm for flowshop sequencingComputers & Operations Research, 1995
- Benchmarks for basic scheduling problemsEuropean Journal of Operational Research, 1993
- An extension of Johnson's results on job IDT schedulingNaval Research Logistics Quarterly, 1956
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954