Optimal Control Approach to Scheduling Power Supply Facilities: Theory and Heuristics
- 5 April 2022
- journal article
- research article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Control of Network Systems
- Vol. 9 (4) , 1679-1691
Abstract
We consider a scheduling problem for a power charging facility under hard bounds on the deliverable power. Appliances require an amount of energy for a certain time interval at specific times. Under congestion, power supply to the appliances may be possibly delayed and the goal of the scheduler is to minimize the average waiting time. We formulate the problem as an optimal control problem. We study three versions of the problem: the case when no interruption of an appliance is possible after admission, the case in which it is possible, and the case in which the overall energy can be delivered at an arbitrary rate over time. We show that these three versions of the problem can be faced in the proposed framework by suitably choosing the cost function. We then propose some relaxations to derive lower bounds for the cost. These lower bounds will be used to test some heuristics with real data available from the literature.Keywords
Funding Information
- Italian MIUR (2017YKXYXJ)
This publication has 52 references indexed in Scilit:
- Charging Scheduling of Electric Vehicles With Local Renewable Energy Under Uncertain Electric Vehicle Arrival and Grid Power PriceIEEE Transactions on Vehicular Technology, 2013
- Control-based p-persistent adaptive communication protocolACM Transactions on Autonomous and Adaptive Systems, 2012
- SCIP: solving constraint integer programsMathematical Programming Computation, 2009
- On the optimality of myopic production controls for single-server, continuous-flow manufacturing systemsIEEE Transactions on Automatic Control, 2001
- Feedback control of production-distribution systems with unknown demand and delaysIEEE Transactions on Robotics and Automation, 2000
- A Network Design Problem for a Distribution System with Uncertain DemandsSIAM Journal on Optimization, 1997
- Minimizing mean flow time with release time constraintTheoretical Computer Science, 1990
- Scheduling subject to resource constraints: classification and complexityDiscrete Applied Mathematics, 1983
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Letter to the Editor—A Proof of the Optimality of the Shortest Remaining Processing Time DisciplineOperations Research, 1968