Preventive maintenance and replacement under additive damage
Authors:
- 1 March 1981
- journal article
- Published by Wiley in Naval Research Logistics Quarterly
- Vol. 28 (1) , 33-46
Abstract
A system deteriorates due to shocks received at random times, each shock causing a random amount of damage which accumulates over time and may result in a system failure. Replacement of a failed system is mandatory, while an operable one may also be replaced. In addition, the shock process causing system deterioration may be controlled by continuous preventive maintenance expenditures. The joint problem of optimal maintenance and replacement is analyzed and it is shown that, under reasonable conditions, optimal maintenance rate is decreasing in the cumulative damage level and that beyond a certain critical level the system should be replaced. Meaningful bounds are established on the optimal policies and an illustrative example is provided.Keywords
This publication has 11 references indexed in Scilit:
- Optimal Pricing to Retard EntryReview of Economic Studies, 1980
- Optimal replacement of damaged devicesJournal of Applied Probability, 1978
- Optimal Replacement with Semi-Markov Shock Models Using Discounted CostsMathematics of Operations Research, 1977
- A survey of maintenance models: The control and surveillance of deteriorating systemsNaval Research Logistics Quarterly, 1976
- Optimal replacement with semi-Markov shock modelsJournal of Applied Probability, 1976
- Controlled jump processesStochastic Processes and their Applications, 1975
- Optimal replacement under additive damage and other failure modelsNaval Research Logistics Quarterly, 1975
- Necessary and Sufficient Conditions for Optimal Control of Semi-Markov Jump ProcessesSIAM Journal on Control, 1973
- Optimal Maintenance and Sale Age for a Machine Subject to FailureManagement Science, 1971
- Maintenance Policies for Stochastically Failing Equipment: A SurveyManagement Science, 1965