Abstract
Reinjection of chemically compatible drainage water into the source aquifer offers a potential pathway for groundwater conservation in mining areas. However, in active mines, reinjection interacts hydraulically with pit dewatering and cutoff curtains. To balance groundwater conservation with operational safety, this study develops an uncertainty-informed risk assessment workflow for reinjection and applies it to an open-pit coal mine. Highly parameterized calibration and null-space Monte Carlo (NSMC) simulations were used to quantify parameter uncertainty and propagate it to predictions of injection storage efficiency, curtain overtopping, bypass flow, and operational reliability. The calibration-constrained ensemble reveals substantial parameter and predictive uncertainty, with spatial mean standard deviations of 66.46 m/d for hydraulic conductivity and 2.50 m for simulated head. Scenario comparisons demonstrate that combined dewatering–reinjection accelerates pressure dissipation and substantially reduces overtopping risk, but provides limited improvement in storage and bypass flow control. Operational reliability is jointly controlled by the reinjection rate and operating duration, allowing a robust operating envelope to be identified with overtopping probability, safe-operation probability, and reliability-based critical time. Curtain extension reduces bypass flow and increases storage efficiency, but it also raises overtopping risk, and shows diminishing returns with increasing length. An idealized test shows that prior hydraulic conductivity constraints may redistribute rather than reduce predictive uncertainty, thereby lowering estimated operational reliability. These findings highlight that dewatering and reinjection evaluation in open-pit mines should account for parameter and predictive uncertainty, with risk probabilities and critical operating conditions providing a basis for robust decision-making.

This publication has 30 references indexed in Scilit: