THE ASSIGNMENT OF INDIVIDUAL RENEWABLE RESOURCES IN SCHEDULING
- 1 September 2004
- journal article
- research article
- Published by World Scientific Pub Co Pte Ltd in Asia-Pacific Journal of Operational Research
- Vol. 21 (03) , 355-377
Abstract
Resource constrained scheduling problems are concerned with the allocation of limited resources to tasks over time. The solution to these problems is often a sequence, resource allocation, and schedule. When human workers are incorporated as a renewable resource, the allocation is defined as the number of workers assigned to perform each task. In practice, however, this solution does not adequately address how individual workers are to be assigned to tasks. This paper, therefore, provides mathematical models and heuristic techniques for solving this multi-period precedence constrained assignment problem. Results of a significant numerical investigation are also presented.Keywords
This publication has 6 references indexed in Scilit:
- Workload balancing and loop layout in the design of a flexible manufacturing systemEuropean Journal of Operational Research, 2001
- Modeling and solving a real-life assignment problem at universitiesEuropean Journal of Operational Research, 1998
- A lexicographic approach to bi-objective loading of a flexible assembly systemEuropean Journal of Operational Research, 1998
- The application of a tabu search metaheuristic to the assembly line balancing problemAnnals of Operations Research, 1998
- Flow Shop Scheduling with Resource FlexibilityOperations Research, 1994
- A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systemsInternational Journal of Production Research, 1989