Prediction of tender price index directional changes
Authors:
- S. Thomas NgSNS. Thomas Ng
- Sai On CheungSCSai On Cheung
- R. Martin SkitmoreRSR. Martin Skitmore
- Ka Chi LamKLKa Chi Lam
- Lai Yi WongLWLai Yi Wong
- 21 October 2000
- journal article
- research article
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 18 (7) , 843-852
Abstract
A multivariate discriminant analysis is described, aimed at predicting the direction of changes in the Hong Kong tender price index by utilizing the patterns of change in eight leading economic indicators. Two discriminant functions are derived which distinguish between ‘upward’, ‘constant’ and ‘downward’ index trends with a high degree of success. The predictive power of the discriminant model is tested by means of a simulated ex post holdout sample of eight index values. By comparing the group centroids, seven of the cases are correctly classified. The hit rate of the ‘upward’ and ‘constant’ groups is 100%, while the ‘downward’ group has a hit rate of 75%, suggesting the ‘downward’ trend to be a more difficult movement to predict. Despite this, the overall predictive results are considerably better than those that would have occurred by chance alone.Keywords
This publication has 11 references indexed in Scilit:
- Forecasting economic turning points with neural nets2002
- Macro-economic leading indicators of construction contract pricesConstruction Management and Economics, 1998
- The implications of the difference in the growth rates of the prices of building resources and outputs in Hong KongEngineering, Construction and Architectural Management, 1998
- The accuracy and optimal linear correction of UK construction tender price index forecastsConstruction Management and Economics, 1995
- International interdependence of business cycles in the manufacturing industry: The use of leading indicators for forecasting and analysisJournal of Forecasting, 1995
- A comparative analysis of three macro price forecasting modelsConstruction Management and Economics, 1994
- MACRO MODELS OF UK CONSTRUCTION CONTRACT PRICESCivil Engineering Systems, 1993
- Escalation management: Forecasting the effects of inflation on building projectsConstruction Management and Economics, 1991
- Methodology and method for price-level forecasting in the building industryConstruction Management and Economics, 1988
- Building price-level forecasting: an examination of techniques and applicationsConstruction Management and Economics, 1987