The Development of a Kanban System: A Case Study
Authors:
- Kwok Hung ShekKSKwok Hung Shek
- Dave MelocheDMDave Meloche
- 1 July 1990
- journal article
- research article
- Published by Emerald Publishing in International Journal of Operations & Production Management
- Vol. 10 (7) , 28-36
Abstract
The application of the Kanban system in a practical environment is reported. The objective was to determine the optimal number of Kanbans for each component part. The effect of the time interval between replenishment of parts on the amount of work‐in‐process inventory was also investigated. Prior to the implementation of the Kanban system, a computer simulation in GPSS was carried out. The results of the simulation run for different attributes are reported. An analysis of results is presented and the basic philosophy of just‐in‐time production, as well as the Kanban system, is discussed.Keywords
This publication has 5 references indexed in Scilit:
- A Mathematical Programming Approach to a Deterministic Kanban SystemManagement Science, 1987
- An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with KanbansInternational Journal of Production Research, 1987
- THE LOGIC OF KANBANJournal of Business Strategy, 1986
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977