As the demand for energy is increasing, the search for oil and gas extends into hostile and challenging environment. Among these problematical environments are the deepwater regions of the world. One of the many challenges faced when drilling deepwater offshore wells is the decreasing window between pore pressure and formation fracture pressure, which is one of the major reliability issues affecting the use of conventional drilling in deepwater. Also, for successful oil and gas exploration, increased accessibility to reserves, improved wellbore integrity, reduced overhead costs and most importantly, providing a safe working environment to take place in this area, new drilling methods must be developed to carry out drilling operations in deepwater. Applying a dual gradient drilling (DGD) technology to offshore drilling isn't a new concept, but one that is being addressed with new fervor and can help meet all of these industry goals. DGD is a rapidly growing technology that has been used in deepwater for various applications nowadays such as, fewer required casing strings, larger production tubing, improved well control and reduction of lost-circulation setbacks etc. In conventional drilling, after detecting a kick, the well is immediately shut in. But, in DGD due to the pressure imbalance the well cannot be shut-in until equilibrium is reached. Otherwise it may lead to formation fracture and lost circulation. This paper focuses upon some of technology related to early kick detection in liquid lift DGD and once a kick is detected, how to stop the further influx and circulate the kick fluid out of the wellbore. To achieve this objective we have analyzed economic and institutional factor by the use of appropriate model predictive control variants. We have concluded our paper with some relevant recommendation on some operational and design strategies as well as future direction for integration of additional variable.