Intelligent Prediction of Subway Tunnel Settlement: A Novel Approach Using a Hybrid HO-GPR Model
Open Access
Abstract
Precise prediction of structural settlement in subway tunnels is crucial for ensuring safety during both construction and operational phases; however, the non-linear characteristics of monitoring data pose a significant challenge to achieving this goal. To address this issue, this study proposes a hybrid predictive model, termed HO-GPR. This model integrates the Hippopotamus Optimization (HO) algorithm—a novel bio-inspired meta-heuristic—with Gaussian Process Regression (GPR), a non-parametric probabilistic machine learning method. Specifically, HO is utilized to globally optimize the hyperparameters of GPR to enhance its adaptability to complex deformation patterns. The model was validated using 52 months of field settlement monitoring data collected from the Urumqi Metro Line 1 tunnel. Through a series of comparative and generalization experiments, the accuracy and adaptability of the model were systematically evaluated. The results demonstrate that the HO-GPR model is superior to five benchmark models—namely Gated Recurrent Unit (GRU), Support Vector Regression (SVR), HO-optimized Back Propagation Neural Network (HO-BP), standard GPR, and ARIMA—in terms of accuracy and stability. It achieved a Coefficient of Determination (R2) of 0.979, while the Root Mean Square Error (RMSE), Mean Absolute Error (MAE), and Mean Absolute Percentage Error (MAPE) were as low as 0.318 mm, 0.240 mm, and 1.83%, respectively, proving its capability for effective prediction with non-linear data. The findings of this research can provide valuable technical support for the structural safety management of subway tunnels.Keywords
Funding Information
- National Natural Science Foundation of China (51868074)
- Natural Science Foundation of Xinjiang Uygur Autonomous Region (2022D01C55)
- Key R&D Program of Xinjiang (2022B03033-1)
This publication has 17 references indexed in Scilit:
- HO-FMN: Hyperparameter optimization for fast minimum-norm attacksNeurocomputing, 2024
- Assessing the influence of geotechnical uncertainty on existing tunnel settlement caused by new tunneling underneathTunnelling and Underground Space Technology, 2024
- A multi-factor-driven approach for predicting surface settlement caused by the construction of subway tunnels by undercutting methodEnvironmental Earth Sciences, 2024
- Enhancing Forecasting Accuracy with a Moving Average-Integrated Hybrid ARIMA-LSTM ModelSN Computer Science, 2024
- Hippopotamus optimization algorithm: a novel nature-inspired optimization algorithmScientific Reports, 2024
- Prediction of surface settlement around subway foundation pits based on spatiotemporal characteristics and deep learning modelsComputers and Geotechnics, 2024
- Time Series Prediction on Settlement of Metro Tunnels Adjacent to Deep Foundation Pit by Clustering Monitoring DataKSCE Journal of Civil Engineering, 2023
- A novel intelligent displacement prediction model of karst tunnelsScientific Reports, 2022
- Risk analysis of TBM tunneling projects based on generic bow-tie risk analysis approach in difficult ground conditionsTunnelling and Underground Space Technology, 2021
- Hybrid meta-heuristic and machine learning algorithms for tunneling-induced settlement prediction: A comparative studyTunnelling and Underground Space Technology, 2020