Pengendalian Durasi Optimal pada Pembangunan Myze Hotel Sumenep Menggunakan CPM dan Metode PERT
Open Access
- 4 January 2024
- journal article
- research article
- Published by Universitas Islam 45 in BENTANG : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil
- Vol. 12 (1) , 49-62
Abstract
The project owner expressed a desire to accelerate the project to avoid delays. According to observations and progress reports, the week 45 progress was 76.071% with a deviation of -7.894%. The delay was caused by the contractor's poor time and cost management which affected the project implementation. Warning letter 1 is given by the owner so that the contractor evaluates and accelerates implementation. Time control is required, as well as time optimization analysis using the PERT method for a more efficient and faster duration. PERT focuses on scheduling with synchronization of project elements, taking into account the uncertainty of the duration of tasks and the overall project. This research aims to identify project duration control by applying PERT and CPM methods, as well as exploring the cost of potential project acceleration through subcontractor integration. Data collection techniques are through project observation and documents such as cost budget plans, S-curves, progress reports, and reference drawings. This data is used to analyze the optimal time through identifying critical activities with CPM and determining the optimal duration using PERT. Alternative project acceleration with the addition of subcontractors. In the research results, the CPM method identifies critical activities such as procurement, piling, connection, and cutting pile heads, from the PERT method the optimal duration is 45 days, with a probability of 59.18%. Alternative acceleration by applying subcontractors occurred cost savings of Rp. 84,855,111.02 or 1.11% of the total normal cost so that the cost of acceleration with subcontractors amounted to Rp. 7,547,781,459.38.Keywords
This publication has 9 references indexed in Scilit:
- Penjadwalan Ulang Pekerjaan Finishing Proyek Shangrila Hotel Resort and Spa Menggunakan Metode PERT dan FLASHJurnal Rekayasa Sipil dan Lingkungan, 2022
- PRODUKTIVITAS HYDRAULIC STATIC PILE DRIVER PADA PROYEK PEMBANGUNAN RUMAH SUSUN MAHASISWA POLITEKNIK PEKERJAAN UMUMOrbith: Majalah Ilmiah Pengembangan Rekayasa dan Sosial, 2022
- OPTIMASI PENJADWALAN PROYEK PEMBANGUNAN JALAN TOL BECAKAYU SEKSI 1BC DENGAN MENGGUNAKAN METODE CPM DAN PERTSustainable Environmental and Optimizing Industry Journal, 2021
- Analisis Optimalisasi Perencanaan Kembali Durasi dan Biaya Proyek menggunakan Metode Pertukaran Waktu dan BiayaJurnal Konstruksi, 2021
- Studi Literature Optimasi Waktu dan Biaya pada Proyek Perangkat LunakRESEARCH : Journal of Computer, Information System & Technology Management, 2021
- ANALISIS UMUR PROYEK DENGAN METODE PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT) PADA PROYEK RENOVASI BANGUNAN MES DAN SARANA PENDUKUNG KANTOR BALAI PENGKAJIAN TEKNOLOGI PERTANIAN BALIJurnal Ilmiah Kurva Teknik, 2021
- Pengaruh Keterlambatan Material Terhadap Risiko Proyek Pembangunan Gedung ParkirBangun Rekaprima, 2019
- Kinerja Alat Hydraulic Static Pile Driver (HSPD) Pada Proyek Perluasan Terminal Bandara Sultan Thaha JambiJurnal Talenta Sipil, 2019
- Susunan RedaksiPerkebunan dan Lahan Tropika, 2015