Abstract
In an advanced planning and scheduling (APS) environment, manufacturers are obliged to estimate due dates for customer orders and satisfy their requirements, including due dates, upon receiving orders. Earlier due dates are especially important in order to obtain orders under increasingly competitive conditions. The present paper discusses a method for estimating earlier due dates in make-to-order production, assuming that a portion of the parts used to build final products can be standardized and the number of customer orders in a certain period varies according to the autocorrelation time series. In the present paper, a method is proposed for deciding the production timing and volume of production for semi-finished products in advance of the future demand, which is linked with a scheduling algorithm for estimating due dates of newly arrived customer orders and updating the overall production schedule. A series of simulation runs were performed while varying both the re-ordering parameter for manufacturing semi-finished products in make-to-stock production policy and a parameter called the ‘module ratio’, which represents the level of standardized parts. The experimental results show that the average lead times can be reduced greatly by holding a small volume of semi-finished products in inventory, which can well be realized by the proposed re-ordering policy for deciding the timing and volume of manufacturing semi-finished products in a make-to-order production environment.