Estimating the probability of meeting a deadline in schedules and plans
- 1 October 2019
- journal article
- research article
- Published by Elsevier in Artificial Intelligence
- Vol. 275, 329-355
Abstract
No abstract availableKeywords
All Related Versions
Funding Information
- Israel Science Foundation (856/16)
This publication has 19 references indexed in Scilit:
- Discrete random bounds for general random variables and applications to reliabilityEuropean Journal of Operational Research, 2007
- Importance sampling algorithms for Bayesian networks: Principles and performanceMathematical and Computer Modelling, 2006
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- Algorithms for computing the distributions of sums of discrete random variablesMathematical and Computer Modelling, 2004
- Complexity of probabilistic reasoning in directed-path singly-connected Bayes networksArtificial Intelligence, 2003
- Approximating probabilistic inference in Bayesian belief networks is NP-hardArtificial Intelligence, 1993
- Probabilistic inference in multiply connected belief networks using loop cutsetsInternational Journal of Approximate Reasoning, 1990
- Computational complexity of PERT problemsNetworks, 1988
- Adaptive sampling — an iterative fast Monte Carlo procedureStructural Safety, 1988
- On the Kolmogorov-Smirnov Test for Normality with Mean and Variance UnknownJournal of the American Statistical Association, 1967