Scheduling Repetitive Construction Processes Using the Learning-Forgetting Theory
Open Access
- 24 February 2019
- conference paper
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 471 (11) , 112039
Abstract
One of the main factors having a decisive impact on the completion date of a construction project and its total cost is the duration of individual processes. Projects such as the construction of multi-storey residential and public buildings, line facilities, highways, networks of external installations or pipelines are conducted with time-location methods of work organization. It is possible to notice the cyclical nature of building processes in projects, whose characteristic parameter is length or height. In such cases, works are entrusted to specialized organizational units (crews, teams) that conduct repeated operations on identical or similar sections, called units. With each repetition of the operations, workers acquire more and more practical experience which has a positive effect on their work efficiency and leads to a reduction in the time and cost of a construction project. The learning theory bring on a mathematical description of the interdependence between the repetitions number of the same task and work efficiency. Taking into account the learning effect allows for a more accurate estimation of the individual construction processes duration, which may provide an advantage at the stage of submitting bids in tenders. The aim of research is to prepare the implementation plan of repetitive construction processes conducted in a multi-storey residential building. The schedule will take into account the impact of the learning and forgetting effect for the duration of construction works and the interruptions in crews work on the example of finishing works. Due to the lack of commercial software for preparing construction schedules taking into account the learning and forgetting impact, a spreadsheet was developed in MS Excel to set the start and end dates and time buffers of construction processes.Keywords
This publication has 30 references indexed in Scilit:
- Construction of multi-storey concrete structures in Italy: patterns of productivity and learning curvesConstruction Management and Economics, 2012
- Linear projects scheduling using spreadsheets featuresAlexandria Engineering Journal, 2011
- Revisiting the applicability of learning curve theory to formwork labour productivityConstruction Management and Economics, 2011
- Understanding the effect of the learning–forgetting phenomenon to duration of projects constructionInternational Journal of Project Management, 2001
- A comparative study of learning curves with forgettingApplied Mathematical Modelling, 1997
- Production breaks and the learning curve: The forgetting phenomenonApplied Mathematical Modelling, 1996
- Economic manufacturing quantities under conditions of learning and forgetting (EMQ/LaF)Production Planning & Control, 1990
- The Impact of Breaks on Forgetting When Performing A Repetitive TaskIIE Transactions, 1989
- Learning as accumulation: A reexamination of the learning curve.Psychological Bulletin, 1978
- THE EFFECTS OF INCREASING SKILL ON CYCLE TIME AND ITS CONSEQUENCES FOR TIME STANDARDSErgonomics, 1957