A semi-supervised production scheduling method based on co-training deep neural network for smart shop floors
- 14 July 2024
- journal article
- research article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 194
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (62133011, 62273260, 62373288)
This publication has 27 references indexed in Scilit:
- An ensemble-based deep semi-supervised learning for the classification of Wafer Bin Maps defect patternsComputers & Industrial Engineering, 2022
- Semi-Supervised Learning of Classifiers from a Statistical Perspective: A Brief ReviewEconometrics and Statistics, 2022
- Semi-supervised data modeling and analytics in the process industry: Current research status and challengesIFAC Journal of Systems and Control, 2021
- A co-training style semi-supervised artificial neural network modeling and its application in thermal conductivity prediction of polymeric composites filled with BN sheetsEnergy and AI, 2021
- Online detection of bearing incipient fault with semi-supervised architecture and deep feature representationJournal of Manufacturing Systems, 2020
- A data-driven scheduling approach to smart manufacturingJournal of Industrial Information Integration, 2019
- A review of unsupervised feature selection methodsArtificial Intelligence Review, 2019
- Adaptive job shop scheduling strategy based on weighted Q-learning algorithmJournal of Intelligent Manufacturing, 2018
- Semi-supervised roughness prediction with partly unlabeled vibration data streamsJournal of Intelligent Manufacturing, 2018
- Game Theory Based Real-Time Shop Floor Scheduling Strategy and Method for Cloud ManufacturingInternational Journal of Intelligent Systems, 2016