Hardening Inspection Devices to Ultra-High Vacuum, Temperature and High Magnetic Field
Authors:
- 18 March 2010
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 20 (3) , 1767-1772
Abstract
In order to demonstrate the feasibility of a mini-invasive inspection arm in ITER, the next step in fusion energy research machines, and to match the need for such a device in the French tokamak Tore Supra, a hardened long-reach robot has been developed by the CEA-LIST robotics team. The AIA (Articulated Inspection Arm), a 8 m long, highly articulated dexterous carrier with a 10 kg payload has been developed to be deployed anywhere in the Tore Supra vacuum vessel from one single Ø250 mm entry point, while the vessel is kept at the operating temperature (120) and pressure . Since its successful demonstration in Tore Supra in September 2008, the robot has been identified by different teams of scientists working on the tokamak for various potential tasks, from vision to diagnostic calibration or component analysis. In order to make such a device even more available, the CEALIST team is now working on the magnetic field constraint on robots. The goal being to demonstrate capabilities of intervention in ITER conditions, the considered field is 4 to 8 T. Technologies, command schemes and design strategies available for an inspection robot tolerant to high magnetic field have been studied. This paper first details the different technologies chosen for the AIA. How such an inspection device has been integrated on a multidisciplinary research machine such as Tore Supra is then detailed in a second part. The paper finally presents various concepts and experimentations to be used in a magnetic field tolerant robot for inspection of a large superconductor machine.Keywords
This publication has 18 references indexed in Scilit:
- Review of design principles for ITER VV remote inspection in magnetic fieldFusion Engineering and Design, 2009
- Real time command control architecture for an ITER relevant inspection robot in operation on Tore SupraFusion Engineering and Design, 2009
- Development of a Laser Ablation System Kit (LASK) for Tokamak in vessel tritium and dust inventory controlFusion Engineering and Design, 2009
- Contribution to DEMO reactor RH maintenance assessmentFusion Engineering and Design, 2009
- Water leak localization and recovery in Tore SupraFusion Engineering and Design, 2007
- Articulated inspection arm for ITER, a demonstration in the tore supra tokamak2006
- Force‐feedback teleoperation of an industrial robot in a nuclear spent fuel reprocessing plantIndustrial Robot: the international journal of robotics research and application, 2006
- Steady-state operation of tokamaks: key experiments, integrated modelling and technology developments on Tore SupraNuclear Fusion, 2005
- Guaranteed properties of gain scheduled control for linear parameter-varying plantsAutomatica, 1991
- Analytical framework for gain schedulingIEEE Control Systems, 1991