Abstract
Purpose: The purpose of this paper is to synthesise critical success factors (CSFs) for advancing post-disaster infrastructure recovery and underpinning recovery authorities in decision making when facing future disasters. Design/methodology/approach: The seismic recovery after the Canterbury (NZ) earthquake sequence in 2010-2011 was selected as a case study for identifying CSFs for an efficient recovery of infrastructure post-disaster. A combination of research approaches, including archival study, observations and semi-structured interviews were conducted for collecting data and evidences by engaging with participants involved at various tiers in the post-disaster recovery and reconstruction. The CSFs are evaluated and analysed by tracking the decision-making process, examining resultant consequences and foreseeing onwards challenges. Findings: Six salient CSFs for strengthening infrastructure recovery management after disasters are identified. Furthermore, the study shows how each of these CSFs have been incorporated into the decision-making process in support of the post-disaster recovery and what difficulties encountered in the recovery process when implementing. Practical implications: The proposed CSFs provide a future reference and guidance to be drawn on by decision makers when project-managing post-disaster recovery operations. Originality/value: The value of the paper is that it bridges the gap between managerial contexts and technical aspects of post-disaster recovery process in an effort to rapidly and efficiently rebuild municipal infrastructure.

This publication has 21 references indexed in Scilit: