Comparing advanced and traditional machine learning algorithms for construction duration prediction: a case study of Addis Ababa’s public sector
Open Access
- 1 December 2024
- journal article
- research article
- Published by IOP Publishing in Engineering Research Express
- Vol. 6 (4) , 045119
Abstract
Accurate prediction of construction durations is crucial for effective project management, particularly in rapidly urbanizing areas such as Addis Ababa. However, there exists a notable research gap regarding the comparative analysis of advanced machine learning (ML) algorithms against traditional methods for this purpose. This study aims to develop and evaluate various advanced ML algorithms to predict construction completion times in Addis Ababa, with the goal of improving resource allocation and enhancing client satisfaction. Data were collected through surveys administered to multiple construction organizations within the city, which served as the foundation for training, validating, and comparing a range of ML models. The research utilized the caret package in R for model development and assessment, incorporating methodologies such as artificial neural networks (NN), Random Forest (RF), Support Vector Machine (SVM), K-Nearest Neighbors (KNN), and Classification and Regression Trees (CART). To evaluate variable importance, multivariate visualizations, including correlation and scatter plot matrices, were employed, while performance metrics such as mean absolute error (MAE), root mean square error (RMSE), and R-squared (R2) were utilized for model comparison. The findings indicated that the RF model achieved an RMSE of 74 days and an R2 of 0.97, while the KNN model also demonstrated strong performance with an RMSE of 81 days and an R2 of 0.97, marking them as the most accurate models for predicting construction durations. In contrast, the NN model exhibited subpar performance, likely due to constraints related to training data and variable selection. As a result, the RF model was further optimized to improve its predictive accuracy. The study concludes that while the RF model proves to be highly effective for predicting construction durations in Addis Ababa, there is a critical need to expand the dataset and incorporate additional variables to enhance the performance of deep learning and other ML algorithms in this field.Keywords
Funding Information
- University of South Africa (NA)
- Addis Ababa Science and Technology University (NA)
This publication has 60 references indexed in Scilit:
- Examining the Efficacies of Different Machine Learning Algorithms on Predicting Future Potential Death from Heart FailuremedRxiv, 2023
- Estimating labor resource requirements in construction projects using machine learningConstruction Innovation, 2023
- Using Artificial Intelligence for Predicting the Duration of Emergency Evacuation During Hospital FireDisaster Medicine and Public Health Preparedness, 2022
- Diagnostic classification of cancers using DNA methylation of paracancerous tissuesScientific Reports, 2022
- Machine learning random forest for predicting oncosomatic variant NGS analysisScientific Reports, 2021
- Cost estimation and prediction in construction projects: a systematic review on machine learning techniquesSN Applied Sciences, 2020
- Hyperparameters and tuning strategies for random forestWIREs Data Mining and Knowledge Discovery, 2019
- A random forest guided tourTEST, 2016
- Using methods from the data-mining and machine-learning literature for disease classification and prediction: a case study examining classification of heart failure subtypesJournal of Clinical Epidemiology, 2013
- The use of artificial neural networks in construction management: a reviewConstruction Management and Economics, 1996