A Robust Scheduling Framework for Re-Manufacturing Activities of Turbine Blades
Open Access
- 16 March 2022
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 12 (6) , 3034
Abstract
Refurbished products are gaining importance in many industrial sectors, specifically high-value products whose residual value is relevant and guarantee the economic viability of the re-manufacturing at an industrial level, e.g., turbine blades for power generation. In this paper, we address the robust scheduling scheme of re-manufacturing activities for turbine blades. Parts entering the process may have very different wear states or presence of defects. Thus, the repair process is affected by a significant degree of uncertainty. The paper investigates the uncertainties and discusses how they affect the scheduling performance of the re-manufacturing system. We then present a robust scheduling framework for the re-manufacturing scheduling strategies, policies, and methods. This framework is based on a wide variety of experimental and practical approaches in the re-manufacturing scheduling area, which will be a guideline for the planning and scheduling of re-manufacturing activities of turbine blades. A case study approach was adopted to examine how re-manufacturers design their scheduling strategies.Keywords
Funding Information
- Marie Curie (814225)
This publication has 37 references indexed in Scilit:
- End-of-Life Decision Making With Uncertain Product Return QuantityJournal of Mechanical Design, 2012
- Measures of problem uncertainty for scheduling with interval processing timesOR Spectrum, 2012
- Robust optimization for resource-constrained project scheduling with uncertain activity durationsFlexible Services and Manufacturing Journal, 2012
- Robust production control against propagation of disruptionsCIRP Annals, 2011
- Min–max and min–max regret versions of combinatorial optimization problems: A surveyEuropean Journal of Operational Research, 2009
- Computing and minimizing the relative regret in combinatorial optimization with interval dataDiscrete Optimization, 2005
- Production planning and control for remanufacturing: industry practice and research needsJournal of Operations Management, 2000
- Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffsComputers & Industrial Engineering, 1997
- Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shopsComputers & Operations Research, 1996
- ROBUSTNESS MEASURES AND ROBUST SCHEDULING FOR JOB SHOPSIIE Transactions, 1994