Temporary Works in Construction of Bridges Near Third Party Assets
Open Access
- 10 February 2021
- book chapter
- Published by IntechOpen
Abstract
This paper gives a summary of the temporary works and methods applied to enable the construction of bridges near third party assets. The temporary structures have a significant impact on the cost, construction method and construction safety of the supported permanent structures. In the literature, there are many examples of how the temporary works could fail catastrophically and could endanger public life if hazard identification, risk assessment and quality checks are not carried out by competent people or organisations. A brief literature survey of the construction techniques is outlined here. This paper looks at more recent failures and draws some more lessons with a re-emphasis on the use of industry established processes, guidelines for preventing catastrophic events. The paper also describes case histories, where mitigation measures are implemented in order to ensure safety by means of independent checks, monitoring and back analysis.Keywords
This publication has 6 references indexed in Scilit:
- Construction of a concrete segmental arch bridge over a railwayProceedings of the Institution of Civil Engineers - Bridge Engineering, 2019
- Temporary Works Toolkit. Part 11: Temporary works associated with precast concrete bridge beam constructionThe Structural Engineer, 2017
- Re-visiting Bragg to keep UK's temporary works safe under EuroNormsProceedings of the Institution of Civil Engineers - Forensic Engineering, 2014
- A survey of failures of bridge falsework systems since 1970Proceedings of the Institution of Civil Engineers - Forensic Engineering, 2012
- Temporary Works: Principles of Design and Construction2012
- BRIDGE FAILURES.Proceedings of the Institution of Civil Engineers, 1976