CAN TIMBER HOUSES BE PRODUCTIVELY FASTER TO BUILD THAN OTHER BUILDINGS?
Open Access
- 1 January 2022
- journal article
- research article
- Published by FapUNIFESP (SciELO) in Revista Árvore
- Vol. 46
Abstract
To identify the time spent with the different construction techniques of timber houses, this study evaluates the execution time of different models available in Brazil. Using face-to-face interviews, semi-structured questionnaires were randomly applied to collect average time according to distinct production methods. The most efficient techniques were: ‘clapboard and wainscot’, ‘post-and-beam’, and ‘log-home’ using artisanal production; ‘clapboard and wainscot’, ‘stick framing with masonry’, and ‘post-and-beam’ in semi-industrial process; and, ‘modular for building sites’, ‘modular in cross-laminated timber’ and ‘modular woodframe’ in industrial production. Different industrial developers were not as agile as artisanal competitors due to production obstacles in customized projects. Timber construction offers lower execution time than masonry, representing an agile form to build a versatile sustainable dwelling.Keywords
This publication has 39 references indexed in Scilit:
- Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction ProjectsJournal of Management in Engineering, 2016
- Construction sector views on low carbon building materialsBuilding Research & Information, 2015
- Impact of European Union Timber Regulation on Forest Certification Strategies in the Finnish Wood Industry Value ChainForests, 2015
- Strategic transformation in the value-added wood products companiesInternational Journal of Emerging Markets, 2015
- Factors Affecting Cost Overruns in Micro-scaled Construction CompaniesProcedia Engineering, 2014
- Characterizing material properties of cement-stabilized rammed earth to construct sustainable insulated wallsCase Studies in Construction Materials, 2014
- Sample Size Policy for Qualitative Studies Using In-Depth InterviewsArchives of Sexual Behavior, 2012
- Cost and time control of construction projects: inhibiting factors and mitigating measures in practiceConstruction Management and Economics, 2010
- Optimization of construction time-cost trade-off analysis using genetic algorithmsCanadian Journal of Civil Engineering, 1999
- A etapa de execução da obra: um momento de decisõesProduction, 1999