The VELCO STATCOM based transmission system project

Authors:
  • JPJ. Paserba
    J. Paserba
  • TCT. Croasdaile
    T. Croasdaile
  • MTM. Takeda
    M. Takeda
  • YHY. Hamasaki
    Y. Hamasaki
  • TAT. Aritsuka
    T. Aritsuka
  • NMN. Morishima
    N. Morishima
  • SJS. Jochi
    S. Jochi
  • III. Iyoda
    I. Iyoda
  • MNM. Nambu
    M. Nambu
  • NTN. Toki
    N. Toki
  • LTL. Thomas
    L. Thomas

Abstract
The Vermont Electric Power Company, Inc., (VELCO) initiated a major transmission system project involving a reconfiguration of a key 115 kV substation and the installation of a STATCOM-based dynamic reactive compensation system. This project has an in-operation date of May 2001. The paper gives an overview of the VELCO transmission system project with emphasis on the STATCOM-based dynamic reactive compensation system. The major items with respect to the STATCOM system addressed in this paper include: power system requirements; STATCOM system description; STATCOM system layout; and STATCOM construction and installation.