A Survey on Parallel Genetic Algorithms for Shop Scheduling Problems
- 1 May 2018
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 629-636
Abstract
There have been extensive works dealing with genetic algorithms (GAs) for seeking optimal solutions of shop scheduling problems. Due to the NP hardness, the time cost is always heavy. With the development of high performance computing (HPC) in last decades, the interest has been focused on parallel GAs for shop scheduling problems. In this paper, we present the state of the art with respect to the recent works on solving shop scheduling problems using parallel GAs. It showcases the most representative publications in this field by the categorization of parallel GAs and analyzes their designs based on the frameworks.Keywords
All Related Versions
This publication has 23 references indexed in Scilit:
- Parallel Genetic Algorithm for solving Job-Shop Scheduling Problem Using Topological sort2014
- Recent Advances on GPU Computing in Operations Research2013
- Solving flow shop scheduling problem using a parallel genetic algorithmProcedia Technology, 2012
- A branch and bound and parallel genetic algorithm for the job shop scheduling problem with blockingInternational Journal of Operational Research, 2012
- An improved hybrid multi-objective parallel genetic algorithm for hybrid flow shop scheduling with unrelated parallel machinesThe International Journal of Advanced Manufacturing Technology, 2010
- A parallel genetic algorithm for a flexible job-shop scheduling problem with sequence dependent setupsThe International Journal of Advanced Manufacturing Technology, 2009
- A Coarse-Grain Parallel Genetic Algorithm for Flexible Job-Shop Scheduling with Lot Streaming2009
- Parallel genetic algorithms with migration for the hybrid flow shop scheduling problemJournal of Applied Mathematics and Decision Sciences, 2006
- A tutorial survey of job-shop scheduling problems using genetic algorithms—I. representationComputers & Industrial Engineering, 1996
- NP-complete scheduling problemsJournal of Computer and System Sciences, 1975