Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times
Authors:
- Dvir ShabtayDSDvir Shabtay
- Kfir ArvivKAKfir Arviv
- 1 March 2016
- journal article
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 40 (5-6) , 4231-4247
Abstract
No abstract availableThis publication has 42 references indexed in Scilit:
- Multiple part-type scheduling in flexible robotic cellsInternational Journal of Production Economics, 2012
- Scheduling multiple robots in a no-wait re-entrant robotic flowshopInternational Journal of Production Economics, 2012
- Scheduling jobs with equal processing times and time windows on identical parallel machinesJournal of Scheduling, 2008
- Job Shop Scheduling with Unit Processing TimesMathematics of Operations Research, 2006
- Multicyclic hoist scheduling with constant processing timesIEEE Transactions on Robotics and Automation, 2002
- Scheduling no-wait robotic cells with two and three machinesEuropean Journal of Operational Research, 2000
- Polynomial time algorithms for minimizing the weighted number of late jobs on a single machine with equal processing timesJournal of Scheduling, 1999
- Cyclic scheduling in 3-machine robotic flow shopsJournal of Scheduling, 1999
- Cyclic Scheduling of Identical Parts in a Robotic CellOperations Research, 1997
- Scheduling unit processing time jobs on a single machine with multiple criteriaComputers & Operations Research, 1990