An integrated approach for production planning—A case study
Authors:
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Job-Shop Scheduling Theory: What Is Relevant?Interfaces, 1988
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic DemandsManagement Science, 1988
- Computerized shop floor schedulingInternational Journal of Production Research, 1988
- A Scheduling Model for LTV Steel's Cleveland Works' Twin Strand Continuous Slab CasterInterfaces, 1988
- Critical Ratio Scheduling: Dynamic Due-Date Procedures under Demand UncertaintyIIE Transactions, 1984
- A heuristic solution procedure for the multi‐item, single‐level, limited capacity, lot‐sizing problemJournal of Operations Management, 1981