Unrelated machine scheduling with time-window and machine downtime constraints: An application to a naval battle-group problem
Authors:
- 1 December 1994
- journal article
- Published by Springer Nature in Annals of Operations Research
- Vol. 50 (1) , 339-365
Abstract
No abstract availableKeywords
This publication has 21 references indexed in Scilit:
- A Multiplier Adjustment Approach for the Set Partitioning ProblemOperations Research, 1992
- (1,k)-configuration facets for the generalized assignment problemMathematical Programming, 1990
- The generalized assignment problem: Valid inequalities and facetsMathematical Programming, 1990
- Integer and Combinatorial Optimization1988
- A block approach for single-machine scheduling with release dates and due datesEuropean Journal of Operational Research, 1986
- The Lagrangian Relaxation Method for Solving Integer Programming ProblemsManagement Science, 1981
- Two-Processor Scheduling with Start-Times and DeadlinesSIAM Journal on Computing, 1977
- Facet of regular 0–1 polytopesMathematical Programming, 1975
- On improving relaxation methods by modified gradient techniques1975
- Validation of subgradient optimizationMathematical Programming, 1974