Improved methods for decreasing stresses of concrete slab of large-span through tied-arch composite bridge
Authors:
- 24 June 2010
- journal article
- research article
- Published by Springer Nature in Journal of Central South University of Technology
- Vol. 17 (3) , 648-652
Abstract
No abstract availableKeywords
This publication has 8 references indexed in Scilit:
- Crack control of a continuous composite two-girder bridge with prefabricated slabs under static and fatigue loadsEngineering Structures, 2007
- Analysis of steel-concrete composite structure with overlap slab of Xingguang bridgeJournal of Central South University of Technology, 2007
- Influence of Concrete Cracking on Composite Bridge Behaviour2006
- Crack control of a steel and concrete composite plate girder with prefabricated slabs under hogging momentsEngineering Structures, 2005
- New technologies of steel/concrete composite bridgesJournal of Constructional Steel Research, 2002
- Concrete Cracking in Composite Bridges: Tests, Models and Design ProposalsStructural Engineering International, 2001
- Parametric study on composite steel beams with precast concrete hollow core floor slabsJournal of Constructional Steel Research, 2000
- Composite bridge design: The reanimation of steel bridge constructionJournal of Constructional Steel Research, 1998