A Constraint-Based Method for Project Scheduling with Time Windows
Authors:
- 1 January 2002
- journal article
- Published by Springer Nature in Journal of Heuristics
- Vol. 8 (1) , 109-136
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Resource-constrained project scheduling: Notation, classification, models, and methodsEuropean Journal of Operational Research, 1999
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relationsEuropean Journal of Operational Research, 1998
- Constraint-Based Job Shop Scheduling with IILOG SCHEDULERJournal of Heuristics, 1998
- Scheduling Multi-Capacitated Resources under Complex Temporal Constraints1998
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order productionOR Spectrum, 1997
- Applying constraint satisfaction techniques to job shop schedulingAnnals of Operations Research, 1997
- A computational study of constraint satisfaction for multiple capacitated job shop schedulingEuropean Journal of Operational Research, 1996
- Heuristics for the minimum project-duration problem with minimal and maximal time lags under fixed resource constraintsJournal of Intelligent Manufacturing, 1995
- Temporal constraint networksArtificial Intelligence, 1991
- Networks of constraints: Fundamental properties and applications to picture processingInformation Sciences, 1974