Multiple of Hybrid Lambda Iteration and Simulated Annealing Algorithm to Solve Economic Dispatch Problem with Ramp Rate Limit and Prohibited Operating Zones
Open Access
- 4 January 2019
- journal article
- research article
- Published by Springer Nature in Journal of Electrical Engineering & Technology
- Vol. 14 (1) , 111-120
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Cuckoo search algorithm for combined heat and power economic dispatchInternational Journal of Electrical Power & Energy Systems, 2016
- Solution to Economic Power Dispatch Planning Problem considering Generator Constraints using Artificial Bee Colony AlgorithmInternational Journal of Hybrid Information Technology, 2016
- PARTICLE SWARM OPTIMIZATION TECHNIQUE FOR DYNAMIC ECONOMIC DISPATCHInternational Journal of Research in Engineering and Technology, 2016
- Genetic Algorithm-based Cost Optimization Model for Power Economic Dispatch ProblemBritish Journal of Applied Science & Technology, 2016
- A Novel Approach to Capture the Maximum Power Generation from Wind Turbines Using Hybrid MLP Neural Network and Bees Algorithm (HNNBA)IETE Journal of Research, 2015
- Multiperiod hydrothermal economic dispatch by an interior pointmethodMathematical Problems in Engineering, 2002
- Economic load dispatch multiobjective optimization procedures using linear programming techniquesIEEE Transactions on Power Systems, 1995
- Environmentally constrained economic dispatch using the LaGrangian relaxation methodIEEE Transactions on Power Systems, 1994
- Reduced-gradient method for economic dispatchProceedings of the Institution of Electrical Engineers, 1973
- Economic System Operation Considering Valve Throttling Losses II-Distribution of System Loads by the Method of Dynamic ProgrammingTransactions of the American Institute of Electrical Engineers. Part III: Power Apparatus and Systems, 1962